GOULBURN DATA CENTRE
1GW STRATEGIC TARGET
A strategically positioned 100-hectare land platform in the Sydney–Canberra corridor, seeking joint venture development, capital, energy, and hyperscale partners to execute an initial 100MW+ development pathway leading toward a 1GW-scale regional digital infrastructure campus.
Core Platform Advantages
Combining multi-hundred hectare land scalability, major high-voltage transmission proximity, and primary intercity transport corridors.
Strategic Site Location & Infrastructure Context
Key site positioning parameters, regional infrastructure alignment, and high-voltage transmission corridors.
- Strategic Campus Location Goulburn Infrastructure Precinct, NSW
- Land Footprint Target 100 Hectares (Regional Campus)
- Geographic Alignment Sydney–Canberra Infrastructure Corridor
- Road Transport Access Regional road access to Hume Highway corridor
- Primary Transmission (Collector–Marulan) 330 kV Line (~6 km Desktop Assessment)
- Secondary Transmission (Yass–Marulan) 330 kV Line (~10 km Desktop Assessment)
- Municipal Authority Goulburn Mulwaree Council (LGA)
Investment Opportunity & Deal Structure
A structured co-development model bringing together site platform control, power connection strategy, and institutional capital.
Joint Venture (JV) Co-Development Platform
The landowner platform offers site control over the strategic 100-hectare regional land footprint in Goulburn. We are inviting experienced developers, energy infrastructure partners, and institutional investors to structure a Joint Venture targeting an initial 100MW+ deployment leading toward a 1GW-scale campus.
What the Landowner Brings
- 100 Ha Land Platform: Unencumbered strategic land footprint in the Sydney–Canberra corridor.
- Preliminary Desktop Studies: Initial GIS overlays, fiber pathway assessments, and 330kV proximity data.
- Planning Pathways: Ongoing engagement with local planning frameworks within Goulburn Mulwaree LGA.
- Agile JV Alignment: Flexible commercial structure structured for developer and capital partnership.
What We Seek in Partners
- Data Centre Developer: Experience in engineering, NSP applications, precinct design, and build-out.
- Energy / Power Partner: Technical capability in 330kV transmission connection, sub-station design, and BESS.
- Institutional Capital: Funding for NSP connection enquiries, formal studies, and capital development.
- Anchor Tenants: Cloud providers, hyperscalers, or AI compute operators seeking multi-MW scale capacity.
Power Infrastructure Strategy
Focusing on major 330 kV high-voltage transmission lines to support multi-hundred MW expansion.
Collector–Marulan 330 kV Transmission Corridor
Primary target corridor for high-capacity, multi-hundred megawatt grid connection.
- Proximity: Desktop assessment indicates active 330 kV transmission infrastructure located ~6 km from site.
- Campus Pathway: Potential pathway for high-capacity connection, subject to Transgrid connection capacity and network augmentation.
- Connection Process: Requires formal Connection Enquiry, System Impact Studies (SIS), and long-lead transmission planning.
Yass–Marulan 330 kV Transmission Corridor
Secondary high-voltage transmission route offering regional grid redundancy potential.
- Proximity: Desktop assessment indicates secondary 330 kV line located ~10 km from site.
- Redundancy Target: Potential for dual-feed or staged capacity expansion across the regional network.
- BESS Integration: Opportunities for integrated large-scale battery storage to support grid stability.
Project Status & Next Milestones
Transparent progress tracking across key feasibility and development phases.
Site Platform Control
100-hectare strategic regional land footprint secured under platform control in Goulburn, NSW.
Desktop Transmission Evaluation
Desktop identification of ~6km and ~10km 330kV transmission corridors and regional transport alignment.
Formal NSP Grid Application
Formal Connection Enquiry and System Impact Studies with Network Service Providers (Transgrid) to be initiated with JV partners.
Planning Framework Assessment
Preliminary local planning strategy and state-significant infrastructure pathways under active evaluation.
Detailed Engineering Studies
Execution of geotechnical, civil, water servicing, and environmental impact assessments with development partners.
JV Partner Engagement
Inviting developers, capital funds, energy partners, and hyperscale anchor tenants for confidential JV discussions.
Partnership Matrix
Key strategic capabilities sought to complete the Joint Venture development platform.
Data Centre Developer
Operators to lead precinct planning, 330kV connection applications, and facility execution.
Development Capital
Infrastructure funds seeking early-stage partnership in a 1GW-scale strategic digital land platform.
Energy & BESS Partners
Power developers to drive the 330kV grid connection, substation delivery, and storage integration.
Anchor Tenants
Hyperscalers and AI compute providers seeking custom-built, long-term scalable capacity.
Engage with the Landowner Platform
Submit a confidential inquiry to request the partner briefing document or explore joint venture opportunities.